WCA Projects, Project Network

Case Studies

Member Project Spotlight



EGL Perform Storage & Transport for Beni Sweif Cement Project in Egypt


Egyptian Global Logistics (EGL) Subsidiary of KADMAR GROUP successfully delivered 2 Gearboxes and 2 Transformers from Adabiya port in Suez to Beni Sweif cement factory after storage in port yard using Beams and steel support.




Each unit traveled a total distance of 280 Kms using 10 axle lines of a Goldhofer modular trailer. Weighting 78 tons with 3.40m height, 6.90m long however the major challenge was the 6.90m width, as the basic route involves a number of narrow roads and obstacles.



EGL overcame obstacles and tight schedules, solving the challenges in the safest and most cost-effective technique. Through careful planning, precise maneuvering and absolute precision, EGL was able to transport the units safely to the factory site.



Thanks to EGL Project Team for the cooperation, EGL continue to impress the market with the well trained staff along with the latest fleet equipment in Egypt.


For more information or inquires on heavy lifts feel free to contact us at medhat@kadmar.com; mahmoud@kadmar.com ; projects@eglegypt.com




WCA SUBSIDIARY NETWORKS
  • globalaffinityalliance.com
  • lognetglobal.com
AIRLINE PARTNERS
MEDIA PARTNERS
  • www.a-zgroup.com
  • www.worldlogisticsmedia.com
  • aircargoworld.com
  • www.heavyliftpfi.com
MEMBER OF