Member Project Spotlight isa – independent shipping agencies, Germany Ships Sooth Blower System from Hamburg, Germany to Port Klang, Malaysia
The circumstances were rather challenging, as the vessel delayed the arrival three times and the production site needed to get the cargo off their site, as they needed the storage space, plus isa always tries not to run the risk of storage at the terminal. Pick up dates were changed several times and duly communicated with the production site and the truckers. The units were loaded by means of container gantry bridge (SWL 82 mt) in connection with a frame traverse (SWL 93 mt). Always 4 lifting chains (SWL 10 mt each) attached to the frame traverse were slung around the units’ foundation at the designated lifting areas. Anti-sliding / rubber pads were placed underneath the wooden cases in order to ensure a sufficient coefficient of friction (μ = 0.6). isa GmbH, Hamburg is very happy to have performed the project for our customer and fulfilled their requirements completely and on time. For more information, please contact Liudmila Halauko, isa GmbH <Liudmila.Halauko@isa-ger.com>
|