Member Project Spotlight EXG Transports 1360 MT of 40,860 MT for the Mumbai Trans Harbour Link Project
The transportation was done for one of the largest infrastructure projects in India, the “Mumbai Trans Harbour Link Project (MTHL)”. The cargo was moved at the Heavy Civil Infrastructure IC site, Sewri, Mumbai. The OSD measured L 118 m x W 14.87 m x H 7.5 m. The cargo was transported on 12 axle line x 4 (48 axles) and a 12 axle line x 2 ( 24 axles) totalling 72 self-propelled modular transporter (SPMT) axle lines with 4 Power Pack Units (PPU). The first of the 30 pieces of cargo was moved from the manufacturing units’ assembly line to Kerosene Jetty; the load transfer at the jetty was done from SPMT to skid chair car. Some salient features of the operation were:
The team's thorough planning to organise and prepare at the site before the movement of the cargo took place, allowed for a smooth execution of the project. The team ensured the highest safety standards. EXG was committed to speed up the transport and is proud to be associated with the prestigious MTHL project. Contact: Vishvendra Singh <vishvendras@expressworld.com>
|